Minutes of Transportation Committee (TC) Meeting, December 8, 2025
Next meeting: TBD, January, 2026 (after meetings with SB, VHB, SWRPC – see below)
Present: Mary Day Mordecai (chair), Russ Cobb, Ned Hulbert, John Knight, Claire Lingham, Kully Mindemann, Don Scott; Absent: Roxanne Karter, Steve LaMears, Police Dept (Matt Perry), Ryan Whitworth.
Public Attendees: none
1) Harrisville was not chosen for a MAST grant award this year
Mary Day discussed some key details on why Harrisville’s MAST grant application was not accepted for funding. In talks with Henry Underwood of SWRPC, she learned that the grant scored well in many categories. Henry encouraged TC to reapply next year and to consider these aspects to make the application stronger, specific weaknesses that can be addressed next year:
- a) More in-kind and town financial commitment to make a financially competitive “ask.”
- b) More research into details of engineering study with contractor cost estimates; i.e. a level of detailed support data to more strongly justify our application.
- c) Smaller chunks of work, perhaps, to enable a more competitive application. A $130K pot was divided among three towns awarded MAST grants this fall (TC asked for $88K).
-TC needs to follow-up with those who pledged $4,700 in gifts to the MAST project, as a thank you and as an update on the status of their pledge, which is now no longer relevant.
-Should TC discover how to cut back on next year’s 2026 MAST grant and apply for only 1 or 2 fundable, smaller segments?
-Should TC investigate possible funding links to a state administered (fed-funded) trail improvement group – as our walking path segment might qualify?
-TC brainstormed 3-4 smaller segments into which the project might be divided, which might be prioritized and worked on sequentially, as discrete separate projects:
-Shear off ledge next to General Store and creating a path on ledge side of Main St
-Focus solely on the crosswalk
-Do an engineering study focused on Main St walking path or berm
-Do a full engineering study of all three options above (using all Segment 3 survey data) so that specific construction costs/bids can be made by local contractors, etc.
-As the conversation proceeded, it became evident that TC may need to acknowledge that the VHB five segment walking path project is too large a project for a small committee like TC to advocate for and manage alone.
The safety and access benefits to town residents of completing not just segment 3 – but all five segments from Main St/Nelson Rd fork to the Main St/Hancock Rd – are large, comprehensive and prepare the town for the kind of long-term upgrade needed for the town’s next 50 years.
TC could argue the town needs to raise the importance of approaching not only the Segment 3 work (which our MAST grant only partially addressed completing), but all five segments with key entities like Select Board, VHB (Greg Bakos), SWRPC and via a Town Community Conversation (when enough data is available to provide a substantive discussion with residents).
In conclusion, does TC need to frame a larger project than TC can manage? Mary Day will speak to VHB (Greg) and coordinate talks with Select Board and SWRPC before next TC meeting – all to widen our sense of possible next steps/larger strategy to address Segment 3 and larger 5 segment question.
2) Update from John Knight on Community Center progress and adjacent area:
-Parking lines are in front of General Store (9 parking parking spots, angled slightly)
-Still have to put top coat on paving near Community Center
-Building construction is going well, slowly – soft launch in Feb/Mar with Spring grand opening
-This spring, brick patio to be completed.
-Deck completion is coming soon.
-Total Cost of work: $850K from CDFA and $150K in other donations/grants equaling $1M total