A photographic update of the new Highway Department garage under construction.
- The Town cleared the site in 2012
- Heavy blasting was necessary to bring the site to rough grade
- Wesfield Construction Superintendent Scott Castine Confirms Layout
- Highway Department handled all excavation needs for the new building
- Trenching for footings
- Jim Porter operated hydraulic hammer to break rock obstructing foundation wall
- North Foundation Wall In Place
- Runoff from vehicles stored inside will be collected in this holding tank below the floor